Idea Statica
  • Steel
  • Concrete
  • Support & Learning
  • Pricing
  • Company
  • Steel overview
  • Connection design
  • Member design
  • Parametric design
  • Steel case studies
  • Concrete overview
  • Walls and D-regions
  • Anchoring design
  • Concrete case studies
  • BIM Overview
  • Supported integrations
  • Checkbot
  • Viewer
  • APIs
  • Support Center
  • E-learning & certification
  • Blog
  • Downloads & Licensing
  • Plans
  • Free community tool
  • Enterprise customers
  • Students & educators
  • How much will you save?
  • About us
  • Contact
  • Research & development
  • Authorized resellers
  • Meet our customers
  • Career
  • Steel
    Steel overviewConnection designMember designParametric designSteel case studies
  • Concrete
    Concrete overviewWalls and D-regionsAnchoring designConcrete case studies
  • BIM OverviewSupported integrationsCheckbotViewerAPIs
  • Support & Learning
    Support CenterE-learning & certificationBlogDownloads & Licensing
  • Pricing
    PlansFree community toolEnterprise customersStudents & educatorsHow much will you save?
  • Company
    About usContactResearch & developmentAuthorized resellersMeet our customersCareer
14-Day Trial
14-Day Trial

Subscribe to our newsletter

Company

  • About us
  • Partners
  • Careers
  • Patent

Resources

  • Customer projects
  • Case studies
  • Connection Library
  • Verification books

Legal

  • EULA
  • Privacy policy
  • California Privacy
  • TOS Viewer
  • Licensing

Help

  • Contact
  • Quote request
  • Resellers
  • Downloads
FacebookInstagramLinkedInYouTube

ยฉ IDEA StatiCa 2009-2026

Trusted and used worldwide by engineers, fabricators & consultants.

CompanyCustomer projectsArch railway bridge, Jetetice
Arch railway bridge, Jetetice
Concrete

Arch railway bridge, Jetetice

Czechia

The project proposes a new reinforced concrete arch railway bridge with a span of 156 m, making it the longest of its kind in the Czech Republic. The bridge spans the valley of the Orlik water reservoir on the Vltava river on km 41.791 of the Tabor โ€“ Pisek railway line.

The arch is constructed as a suspended cantilever using temporary cable stays, which, due to the high number of construction phases, has led to a big data issue and increased the requirements of FEM and design software. For the design of each bearing part, IDEA StatiCa software was used, primarily using the BIM module and secondarily using the RCS module, when neglecting the construction phases was possible, allowing for shorter computing times.

In addition, other problems were solved using MIDAS Civil: the verification of stay cables' effectiveness through geometrically nonlinear calculation; a second order problem for slender piers through linear buckling analysis, combined with a nonlinear calculation for additional internal forces' evaluation.

Gallery

1 of 5

Gallery

5 of 5
1 of 5